Decommissioning Solutions

  • Oil & Natural Gas Corporation (ONGC), Additional Development of Vasai East Project – 2 Wellhead Platforms, 35 km Pipelines and modification in Western Offshore, India.

  • ADMA-OPCO, ULN Phase-1 Field Development Project – The decommissioning scope, in additional to greenfield works, involved removal of existing platform periphery facility for installing new modules which required shutdown, isolation, draining, venting, lift analysis of existing demolished facility and new modules and cutting of existing primary members and tubulars for integration of new facility.

  • Oil & Natural Gas Corporation (ONGC), NQ Reconstruction Project Revamping, reconstruction, replacement, refurbishment and addition of new facility at NQO, NQD, NQG and NQP platform.  Scope includes replacement of booster compressor with a new process gas compressor module (2.4 MMSCMD), revamp of produced water conditioning system, hot oil system, gas dehydration unit, etc in Mumbai High North.

  • Qatar Petroleum, PS-2 & PS-3 Living Quarters - The decommissioning scope, in additional to greenfield works, involved removal & relocation of existing LQ modules (2 Nos. ) with helidecks, transportation analysis for relocation of existing LQs, replacement with new LQ Platform with 4 legged jacket & Helideck, 1 interconnecting bridge, design of a new switch gear room, fire and gas system upgrade and complete revamp of PA/GA system.