Brownfield & Upgradation Projects

  • We have a track record of 230 platform modification works. Following are some of the executed EPCIC projects:

  • Saudi Aramco, Marjan Increment Program Offshore Oil Package # 2 Project - 9 Oil Production Deck Modules, 1 Tie-in platform Module, 3 Tie-in Platforms, 250 Kms Cable, 220 Kms Pipelines and Brownfield Modifications in Zuluf Fields, Saudi Arabia.

  • Oil & Natural Gas Corporation (ONGC), Balance Work of Pipeline Replacement Project 4 – 86 km of subsea pipelines, risers & I/J tubes, crossings & free span corrections and Topside modifications at 42 platforms (Demolition and installation of risers and launchers; Deck Extensions (~200 MT); new/modification of Shutdown Panels), Demolition of 53 of redundant risers and Minor/Punch works at 23 platforms.

  • Saudi Aramco, Replace 17 Tower Cranes in Marjan & Zuluf Fields – Replacement of 17 Nos. Tower Cranes, CCTV Systems, Related E&I accessories, Related security systems.

  • Oil & Natural Gas Corporation (ONGC), NQ Reconstruction Project - Revamping, reconstruction, replacement, refurbishment and addition of new facility at NQO, NQD, NQG and NQP platform.  Scope includes replacement of booster compressor with a new process gas compressor module (2.4 MMSCMD), revamp of produced water conditioning system, hot oil system, gas dehydration unit, etc in Mumbai High North.

  • Oil & Natural Gas Corporation (ONGC), Re-routing of SBHT Pipeline - Rectification of 42" SBHT pipeline at Umbrahat Beach, Gujarat.

  • PETRONAS Carigali Myanmar (Hong Kong), Yetagun North Phase V Development Project – 1 Wellhead Platform, 11.3 km subsea pipelines and major brownfield works on existing process platform - 84 MT of Structural Deck Extension Panels at offshore, ~2242 inch-dia. of offshore piping fabrication & replacement, commissioning of major equipment such as Fuel Gas Skid, Micro-Turbine Generator (MTG), Emergency Diesel Generator and Plant Monitoring and Control System (PMCS). The above modification works were completed ahead of schedule in Client specified shutdown period.

  • Lynemouth Drilling SA (Subsidiary of Foresight Ltd., U.K.) FD-VII, Repair & Modification Project- Complete refurbishment & repair of FD VII rig including fabricating and installing new legs with spud can, refurbishment of living quarters, installation of new Drill Floor and equipment. The rig, which was completely devastated by Hurricane Katrina was made operational to the satisfaction of the customer.

  • Qatar Petroleum, PS-2 & PS-3 Living Quarters - Upgradation of two 45 men Living Quarter, power module, F&G upgrade, 3 jackets and four bridges.

  • Oil & Natural Gas Corporation (ONGC), Major Lay-up & Repair / Modification of Offshore Jack-up Drilling Rig ''Sagar Uday" - Complete Revamp / Modification of Offshore Drilling Rig for operating in 300 ft water Depth and 20000 ft Drilling Depth in Mumbai Offshore Oil & Gas Fields, India.

  • Oil & Natural Gas Corporation (ONGC), Sagar Laxmi Topsides Modifications Project comprising Well Fluid receiving facilities on production Jack-up in Offshore West Coast, India.